Monday, August 11, 2008

Teardrop trailer construction 10


Those of you who are following our trailer construction have most likely figured out that we
haven't had very much time to work on the trailer in the last few weeks.

We did install the jack stand for the front of the trailer. It will be nice not to have to drag a bucket arount to rest the tongue on. This is detachable because we are adding a storage box on the front that will prevent us from folding it up.



We also acquired the ceiling fan and
installed it. We are currently wiring all the electrical stuff so we needed it in place to wire. We painted the
frame black so it would match our other interior items and trim.




We also installed the sink faucet and water pump. The water inlet came today so we should be able to hook up the plumbing in the next available working days.


We are hoping to complete the wiring so we can put the side paneling on the outside of the trailer this next week. We think we will be better off once we get back to the wood things that we understand.





1 comment:

Bess Family said...

WOW dad the trailer is really coming along. i can not believe how much has been done since I last saw it!!! I am very impressed with what you and Uncle Kent are doing!!! LOVE YOU